uWaterloo Stratford releases designs for campus

February 16, 2011

Preliminary design sketches for the University of Waterloo's Stratford campus show a modern, 3-storey brick-and-glass facility, whose front face will be dominated by a massive wall of windows. A key design feature is a towering digital media wall that will run nearly the entire height of the building. Inside, the facility will feature a number of classrooms, project rooms, and collaboration spaces, with a fairly open-concept design to foster an easy flow and exchange of ideas. Construction of the campus is expected to be completed by July 2012. uWaterloo Stratford News Release | Stratford Beacon-Herald